T-Craft |
Phase I - Concept Design. This effort included design of the general arrangements, stability and sea keeping analysis. GHS, Rhinoceros, Visual SMP and AutoCAD were used to accomplish this work. |
|
Dave Maurer
AMSEC/SAIC
202.608.8449 |
www.globalsecurity.org
|
T-AGM(R) |
Phase II - Detail Design and Construction. N00024-06-C-2215 Developed the Accepted Weight Estimate, Mass Moment of Inertia Report, and the Weight Distribution Report. |
|
Dave Maurer AMSEC/SAIC 202.608.8449 |
www.globalsecurity.org |
Sealift Support Program Office |
Project Engineering supporting the NAVFAC government office at the Washington Navy Yard. Program management responsibilities included: Integrated Navy Lighterage System(INLS), LARC-V, OPDS, and ABLTS. |

|
Dan McCluskey Sealift Support Program Office 202.685.6012
|
www.portal.navfac.navy |
DD(X) |
Contract Design - Performed spec development, weight and KG trade studies, and managed the MEL while supporting the Ship Design Manager as a member of the Core Design and Integration Team. |

|
Don Ewing
Northrop Grumman Ship Systems
donald.ewing@ngc.com |
http://www.globalsecurity.org |